Tri-annual publication cycle – March 2020
New and updated technical documents are available on the Department of Transport and Main Roads website. The March 2020 cycle documents were published on the 18 March, earlier than the end of March timeframe, in light of the current COVID-19 situation.
Specifications
10 specification suites were amended.
The following suites have Work Item Number changes, including new, amended and withdrawn numbers:
MRTS04 General Earthworks
MRTS45 Road Surface Delineation
View the Specifications Amendment Register
Standard Drawings
10 new and 53 drawings were amended.
The NEW drawings include:
SD1270 – Fish Passage – RC Box Culverts in ADR Red Mapped Waterways (Drawings 1 to 2 to Drawings 2 to 2)
SD1271 – Fish Passage – R C Box Culverts in ADR Amber Mapped Waterways
SD1711 – Traffic Signals/Road Lighting – Circular Combination Mast Arm U Series – Information for Ordering Purposes
SD1712 – Traffic Signals/Road Lighting – Circular Mast Arm Fabrication Details
SD1713 – Traffic Signals/Road Lighting – Circular Mast Arm Type U1 – Post Without Luminaire Spigot – Assembly and Details
SD1714 – Traffic Signals/Road Lighting – Circular Combination Mast Arm Type U2 – Post with Luminaire Spigot – Assembly and Details
SD1715 – Traffic Signals/Road Lighting – Circular Mast Arm Outreach – 2.5 m, 5.0 m and 6.5 m – Assembly and Details
SD1716 – Traffic Signals/Road Lighting – Circular Combination Mast Arm Luminaire Transition Piece – Assembly and Details
SD1721 – Traffic Signals – Base Mounted Traffic Signals Post – Assembly and Details
SD2023 – 550 Octagonal PSC Piles – Spliced Pile Details (Drawing 1 of 4 to Drawing 4 of 4)
View the Standard Drawings Amendment Register
Contracts
There are no Contract document amendments this cycle.
Technical Notes
The following Technical Note has been updated:
TN63 Assessment of Electrical Pit Products to MRTS78 and MRTS91
View the Technical Notes Amendment Register